Customize Consent Preferences

We use cookies to help you navigate efficiently and perform certain functions. You will find detailed information about all cookies under each consent category below.

The cookies that are categorized as "Necessary" are stored on your browser as they are essential for enabling the basic functionalities of the site. ... 

Always Active

Necessary cookies are required to enable the basic features of this site, such as providing secure log-in or adjusting your consent preferences. These cookies do not store any personally identifiable data.

No cookies to display.

Functional cookies help perform certain functionalities like sharing the content of the website on social media platforms, collecting feedback, and other third-party features.

No cookies to display.

Analytical cookies are used to understand how visitors interact with the website. These cookies help provide information on metrics such as the number of visitors, bounce rate, traffic source, etc.

No cookies to display.

Performance cookies are used to understand and analyze the key performance indexes of the website which helps in delivering a better user experience for the visitors.

No cookies to display.

Advertisement cookies are used to provide visitors with customized advertisements based on the pages you visited previously and to analyze the effectiveness of the ad campaigns.

No cookies to display.

Office Fit Out Batley, West Yorkshire

Office Fit Out & Office Partitioning Batley West Yorkshire

Office Fit Out & Office Partitioning Batley West Yorkshire – In Out Solutions have been contacted to undertake office fit out & office partitioning project for a new client in Batley. Founded in 1992, Cex Ltd is a second hand goods chain specialising in computing, video games. Today, the company have more than 380 shops in the UK and over 100 abroad.

We have been approached to provide office fit out and glass partitioning throughout their new offices in Batley. Zex Yorkshire had taken additional building space that needed to be completely designed and refurbished.

Office Fit Out Product Summary:

  • Strip out existing walls, flooring, toilets
  • Form several offices using 12mm toughened glass partitioning with glass doors
  • Decoration to all walls, radiators, windows
  • Installation of new toilets (gents + ladies)
  • Disposal and recycling

Single Glazed Partitions with Single Glass Doors

  • Standard Full Height Single Glazed Partitioning, Non – Fire – Rated
  • 12mm toughened glass Height 2700mm
  • Dry jointed, fitted with aluminium black channels (RAL 9005)
  • Frameless Single Glass doors (No.2 ), 12mm toughened full height single glazed
  • Hydraulic Patch Fitting
  • Smart Glass Door Fingerprint Locks

Project Value £21,000 + VAT (the price includes on site survey, supply, delivery and install, aftercare)

Office Fit Out Batley, West Yorkshire – Result

In Out Solution’s Managing Director commented: “In Out Solutions were selected by Zex Yorkshire after our services have been recommended by another satisfied customer. We always put in our best to each project to deliver quality result. In Out Solutions is known for delivering result that always meets clients requirements. Yet again, this project was completed to the highest standard and within the allocated time.”

Glass partitions walls has given a modern touch to the office. They allow natural light into the office, are easy to install or remove.

If you are looking for Office Fit Out or Glass Partitioning, then get in touch with In Out Solutions through their email enquiries@inoutsolutions.co.uk or our twitter account.

Project Photos (More photos to be added once project completed)

× NEED HELP? CLICK HERE TO CHAT